Port of Long Beach terminal drayage starts with the correct terminal, not a port-wide booking rule. The Port lists six containerized terminal operations: LBCT, TTI, ITS, PCT, Pier A and Pier C. Confirm your container’s location, release status, appointment and gate schedule before sending a truck. A reservation does not clear a hold or guarantee pickup.
This guide explains where to find current instructions and what to check at each terminal. If you need the trucking side coordinated, our Long Beach drayage service covers the service rather than the terminal rules.
Start with the correct terminal and booking source
The POLB facilities directory lists six containerized tenants. The PierPass appointment directory also includes six Long Beach entries, identifying Pier C as C60. Do not leave that terminal out when matching an arrival notice to a pickup location.
Several terminals use eModal. That does not make their schedules, empty-return rules or appointment inventory interchangeable.
| Terminal | Port location | Appointment starting point | Check before dispatch |
|---|---|---|---|
| Total Terminals International (TTI) | Pier T | Terminal website links to eModal | Gate schedule, trucker updates and container status |
| Long Beach Container Terminal (LBCT) | Pier E / Middle Harbor | LBCT Trucker Portal | Appointment release announcement and truck gate schedule |
| International Transportation Service (ITS) | Pier G | eModal, via the PierPass directory | Dated gate schedule and empty receiving matrix |
| Pacific Container Terminal (PCT) | Pier J | eModal, via the PierPass directory | Terminal-specific reservation and receiving instructions |
| SSA Terminals, Pier A | Pier A | eModal, via the PierPass directory | Pier A location, cargo status and move requirements |
| SSA Terminals, Pier C / C60 | Pier C | Carrier and terminal instructions | Matson-specific cargo and pickup arrangements |
Sources checked November 10, 2026: POLB facilities, PierPass appointments, TTI’s website and SSA container operations. These are resource directions, not confirmation that a particular container is ready.
Use the ocean carrier’s tracking record and the terminal’s cargo search to confirm the discharge location. A service calling Long Beach does not identify the right gate by itself. If your customs paperwork requires a FIRMS code, meaning the facility identifier used in customs records, obtain the current code for the specific facility from your broker and terminal.
Use each terminal’s own operational instructions
TTI at Pier T
The current TTI terminal website links its Appointments button to eModal. It separately provides a gate schedule, terminal map, cargo information and trucker updates.
Check those resources together. An appointment tells dispatch when a move is reserved; the gate schedule tells dispatch whether the relevant operation is offered. Verify import availability, release status and the applicable transaction before confirming the truck. For a paired pickup and drop-off, check both moves rather than assuming a reservation for one covers the other.
LBCT at Pier E / Middle Harbor
LBCT uses automated handling and optical character recognition, which reads container and vehicle identifiers electronically. Its LBCT operations page says appointments are required for all transaction types and digital equipment interchange receipts are available. An equipment interchange receipt, or EIR, records an equipment handoff.
As checked November 10, 2026, LBCT’s announcement says appointments become available at noon, effective August 4, 2025, replacing 11 a.m. This is a slot-release announcement, not the truck gate opening time. Confirm the current announcement and the applicable day’s truck gate schedule before booking.
ITS at Pier G
ITS publishes a dated gate schedule and an empty receiving matrix on its ITS terminal homepage. The matrix separates acceptance by shipping line, equipment size and shift. Some entries permit a dual transaction only, so an empty that is accepted with a pickup may not be accepted as a standalone return.
Do not plan from an assumed five-day reservation window. Use current eModal availability and the terminal instructions. Check the gate-closing time and your transaction’s cutoff separately; a shift’s ending time is not necessarily the last time a truck can enter.
PCT at Pier J
PCT is listed in both the Port’s facilities directory and SSA Marine’s current container operations directory. PierPass directs appointment users to eModal.
Select PCT specifically when checking cargo and booking. Sharing a booking platform with another terminal does not carry over its receiving rules. For temperature-controlled cargo, confirm release status, the pickup instructions and the onward delivery arrangement before dispatch. Use current operational notices rather than crane counts, yard size or gate-lane totals to decide whether a move can proceed.
SSA Terminals at Pier A
Pier A is a separate terminal listing from PCT and C60. SSA’s current container directory identifies Pier A at 700 Pier A Plaza, Long Beach.
Use Pier A’s own cargo record and appointment instructions, even if another SSA-operated terminal handled an earlier shipment. Confirm the correct gate location with the driver and match the appointment to the intended transaction. A common operator or portal is not evidence that an empty can be returned to either facility.
SSA Terminals at Pier C / C60
Pier C belongs in a complete Long Beach terminal guide. POLB lists SSA Terminals at Pier C; PierPass lists C60; SSA describes Terminal C60 as a Matson-dedicated facility.
Confirm your shipment’s Matson and terminal instructions rather than treating C60 as another interchangeable eModal location. The public PierPass directory sends C60 users to SSA Marine, not to a clearly identified booking screen. Ask the carrier or terminal which current process applies to the pickup, return or other transaction before dispatch.
Read gate schedules by date and transaction
There is no dependable port-wide gate-hours table for dispatch. Use the specific terminal’s dated schedule, then check the cutoff for imports, exports, empties and dual transactions. A gate can offer one move while restricting another.
TTI publishes a TTI gate schedule. LBCT directs truckers to its truck gate hours through its website. ITS publishes both general operating hours and a dated two-week schedule.
The ITS gate hours illustrate why the distinctions matter. Its Saturday and no-second-shift section lists gate closing separately from the end of the working shift. Do not read the later shift-ending time as permission to arrive at the gate then. Confirm the applicable cutoff in the current schedule.
Check holiday and stop-work notices for the actual service date. Do not assume that a recurring monthly pattern proves a particular shift is open or closed. A terminal website’s office hours are also not its truck gate hours.
Confirm releases and the appointment before the truck moves
Use this sequence for an import pickup:
- Confirm the container and location. Match the container number and discharge terminal across the carrier and terminal records.
- Check availability and releases. Ask your broker about customs release and check ocean carrier and terminal holds. Vessel arrival alone does not establish pickup readiness.
- Record the last free day. This is the deadline shown for pickup before storage-related charges may begin under the applicable terms. Recheck it when status changes.
- Book the eligible transaction. Use the terminal’s current process, required identifiers and available reservation window.
- Align the truck and delivery. Confirm equipment, driver access requirements and the receiving warehouse’s appointment or unloading arrangements.
- Recheck before dispatch. Review holds, gate notices, empty acceptance and reservation changes. Keep the confirmation with the dispatch record.
Assign a person to monitor the booking. Shippers, brokers and carriers should agree who books, who checks for changes and who tells the receiving facility if the plan moves.
PierPass explains that terminals manage their own appointment systems under OffPeak. Appointment availability and port charges are separate checks. Our PierPass fee guide explains the fee records without treating a night appointment as a fee exemption.
Pair moves only when both transactions qualify
A dual transaction combines a pickup and a drop-off during one terminal visit. For example, an eligible empty return may accompany an import pickup. ITS’s receiving matrix shows why dispatch must check the shipping line, container size and shift rather than assuming all empties are accepted.
Confirm that the booking covers the intended combination. If the import becomes unavailable or the empty receiving instructions change, recheck the entire plan before the driver leaves.
A street turn is different: an empty is reassigned for another shipment without first being returned to the terminal. Obtain the necessary shipping-line and equipment approvals rather than treating it as an ordinary terminal return.
If the pickup plan fails, preserve the records
An unavailable slot, new hold or missed window needs a fresh plan, not a truck sent to test the gate. Check the next eligible reservation, tell the receiving facility and recheck the last free day.
Keep timestamped screenshots of booking attempts, availability records, terminal notices and relevant correspondence. If a charge follows, these help establish what happened. They do not guarantee a free-time extension, waiver or successful dispute.
Demurrage generally concerns cargo remaining at the terminal beyond free time; detention generally concerns the shipping line’s container outside it. Keep both separate from chassis charges. Our container charge guide explains those distinctions. Confirm the applicable tariff and contract rather than assuming that rebooking pauses a charge.
Frequently asked questions
How many container terminals are at Long Beach?
The Port of Long Beach facilities directory lists six containerized tenants: ITS at Pier G, LBCT at Pier E, PCT at Pier J, SSA Terminals at Pier A, SSA Terminals at Pier C and TTI at Pier T. PierPass also lists six Long Beach appointment entries, naming Pier C as C60.
What appointment system does TTI use?
TTI’s current website links its Appointments button to eModal, as checked November 10, 2026. Start from the terminal website so you can also review its gate schedule, terminal map and trucker updates. Confirm the correct terminal, transaction and container status before relying on an available reservation for dispatch.
When does LBCT release appointments?
As checked November 10, 2026, LBCT’s public announcement says appointments become available at noon, effective August 4, 2025, replacing 11 a.m. That is an appointment-release time, not the truck gate opening time. Recheck the announcement, booking portal and dated truck gate schedule before planning your move.
Can I combine an empty return with an import pickup?
A dual transaction may combine an eligible empty return and import pickup during one terminal visit. Check both containers, the shipping line, equipment size, shift and booking requirements before dispatch. Empty acceptance can be restricted to dual transactions, as shown in ITS’s receiving matrix. A reservation does not override cargo holds or changed receiving instructions.
For help coordinating a pickup, send a drayage quote request with the terminal, container size, release status, last free day, delivery address and expected containers per month.
